How to follow up a trade quote: three useful messages
Follow up a quote the customer requested with a clear question, a practical next step and room for them to say no.
By FieldQuote · Published
When should you follow up a quote?
Agree a review date when you send the quote. If no date was agreed, a short check after three to five working days is a reasonable starting point for an ordinary job. Allow longer for a renovation involving several decisions; an urgent repair needs its own agreed timetable. This is a suggested workflow, not a measured optimum.
These messages are for a customer who requested a quote for their job. Use the contact method you agreed, keep the discussion about that quote, and stop if they decline or ask you not to contact them.
1. Check they received it
Send around the agreed review date, or after three to five working days. Include the job and the existing quote link so they can find it.
Hi [name], just checking you received the quote for [job]. Here is the link again: [quote link]. Is the scope clear, or is there anything you would like me to explain before you decide? Thanks, [your name].
If they have not opened it, check the address or preferred contact method. A missing reply does not tell you whether the price, timing or delivery was the problem.
2. Ask what is holding up the decision
If there is still no response, allow another few working days. Use a real scheduling constraint only if one exists.
Hi [name], have you had a chance to look at the [job] quote? If the specification or timing needs changing, let me know and I can review it. Are you still considering the work, or would you prefer me to leave it for now? [Your name].
For a decorator, the issue might be the finish or who moves the furniture. For a carpenter, it could be the material or dimensions. Ask before discounting: changing the scope is a different decision from charging less for the same work.
3. Close the loop politely
If two checks receive no response, use a final message only where it is appropriate to the agreed conversation. Otherwise simply park the job. Do not keep restarting the sequence.
Hi [name], I will leave the [job] quote with you and stop following up. If you want to revisit it, reply here and I can confirm the price and availability at that point. Thanks for asking me to quote. [Your name].
If the customer gives you a later date, record it instead. If the quote has expired, confirm the current scope, price and availability before treating a later reply as a booking.
What to do with each response
- “Can you change it?” Clarify the change, update the scope and price, and send a clearly identified revision.
- “It is more than we expected.” Ask which parts are essential. Explain a smaller scope or alternative specification accurately, including the trade-offs.
- “We are waiting for someone else.” Agree a realistic check-in date and avoid adding repeated reminders in the meantime.
- “Yes, go ahead.” Confirm the accepted version, timing and agreed payment terms. A positive message alone is not evidence that a deposit has been paid.
- “We chose someone else.” Thank them, close the opportunity and respect their decision.
Keep a small follow-up record
For each quote, keep the customer, job, quote reference, sent date, last response, status and next action date. Record accepted and paid as separate events. Review the next-action list once each working day, rather than relying on memory.
If you enable automatic quote reminders in FieldQuote, check their settings and the last message before following up manually. Avoid sending a manual chase just after an automatic one. Stop reminders when the customer's decision or agreed timing makes them unnecessary.
A clear quote makes the follow-up easier. Use the trade quote checklist to check scope, exclusions and payment terms before the first send.
Try it on your next quote
FieldQuote lets you prepare an itemised quote and share a customer link for acceptance. Pro adds card deposits and balance payments through Stripe. Start free; the advertised Pro price is £29 a month. Review the current plan and billing terms before upgrading.
The public demo uses example details and simulated payments.